Skip to content
Order Before 1PM for Same-Day Dispatch
Free UK Delivery on Orders Over £50
Skip to product information
1 of 6

SKU:RDX064

RDX Belt 6" Leather

£29.99
£29.99
Sale Sold out
Tax included. Shipping calculated at checkout.
In stock, ready to be shipped
Color: Black
Size: S
  • Free UK delivery over £50
  • Fast dispatch before 1PM
  • Secure checkout
Secure Checkout With
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Klarna
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Description

RDX 6" Leather Weightlifting Belt

RDX 6" Leather Belt is built for serious lifters seeking strength, stability, and comfort. Made from premium Nubuck leather, this belt features a 6-inch width and 10mm thickness to deliver optimal lumbar support and durability during intense lifting sessions.

Product Overview

Engineered for performance, the RDX 6" Leather Weightlifting Belt combines a sturdy exterior with a soft suede interior to provide support without compromising comfort. Reinforced stitching and a heavy-duty HG steel buckle ensure a secure fit and long-lasting resilience, helping you lift safely and effectively.

Key Features

  • Premium Nubuck leather construction for strength and durability
  • 6-inch width and 10mm thickness for superior lumbar support
  • Heavy-duty HG steel buckle with multiple rivets for a secure fit
  • Perforated, sweat-wicking design for ventilation and comfort
  • Suede leather inner lining for a soft, non-slip grip
  • Industrial-grade stitching for long-lasting performance

Performance Benefits

  • Supports correct posture and spinal alignment
  • Reduces lower back stress during heavy lifts
  • Improves intra-abdominal pressure for greater core stability
  • Ideal for squats, deadlifts, and compound lifts

Specifications

  • Material: Nubuck Leather with Suede Inner Lining
  • Width: 6 inches
  • Thickness: 10mm
  • Buckle Type: Dual-prong HG Steel
  • Gender: Unisex

Usage

Wrap the belt around your core above the hip bone. Adjust and tighten using the buckle until secure but comfortable. Inhale deeply to expand into the belt, creating core tension before lifting. Ideal for heavy compound movements such as squats and deadlifts.

FAQ

What does a powerlifting belt do?

It supports your back and core by increasing intra-abdominal pressure, helping to stabilise your spine and reduce the risk of injury during heavy lifts.

When should I wear the belt?

Use it during heavy or compound lifts like squats, deadlifts, or overhead presses when extra stability and back support are required.

How tight should the belt be?

The belt should fit snugly without restricting breathing. You should be able to expand your abdomen into the belt when inhaling.

How do I choose the right size?

Measure around your waist at the level of your navel and refer to the RDX size chart to find your correct belt size.

Is this belt suitable for both men and women?

Yes, this unisex lifting belt is designed for all athletes, offering optimal support for both men and women.

Care Instructions

Wipe clean with a damp cloth after use. Avoid prolonged exposure to moisture or direct sunlight. Store in a cool, dry place.

Orders are dispatched Monday to Friday.
Orders placed before 1PM are typically dispatched the same working day.
Delivery times may vary depending on location and courier service.
Full shipping details are available on our Shipping Policy page.

We accept returns in accordance with our Refund Policy.
Products must be unopened, unused, and returned in their original packaging.
Refund requests must be made within the stated returns period.
For full details, please refer to our Refund Policy page.

View Product Details